Delivery & access

We sort the truck. You sort the ground.

Cartage is quoted with the container and run by operators we use every week. Around here the truck is rarely the hard part — the ground is.

Real yard1a Reid St, South Grafton
Answered locally(02) 5616 9099
GradesCargo-worthy, as-is and new single-trip
FreightQuoted with the container, not billed after

The three vehicles and what each one needs

Tilt-tray. Most 10ft and 20ft deliveries. It backs in and slides the container off the bed, so it wants roughly 3.5m of width at the pinch point and about 20m of straight run behind the drop spot.

Sidelifter. The 40ft answer. It sets the container down beside the truck on hydraulic legs, so allow around 30m of working room and — this is the one that catches people — ground firm enough to take the legs without them sinking.

Crane truck (HIAB). Lifts over a fence, a hedge or a retaining wall and into places nothing else will reach. Dearer per job, and worth every cent when the alternative is not having a container at all.

What decides it in this district

Three things, in order. Ground bearing, because river-flat silt and coastal sand behave completely differently and both will let a loaded truck down after rain. Overhead clearance, because the older river towns have low services and enormous street trees. And approach length, because a lot of the good blocks around here are long, narrow and sit behind a gate that was built for a ute.

If any of that is uncertain, photographs settle it faster than measurements over the phone. Send a shot of the gateway, one down the approach and one of the spot itself. Full detail in getting a container onto your block.

30-second access check

How wide is the clearest path to the drop spot?

Straight run-up to where it is going?

Anything overhead — wires, branches, awnings?

Setting the container down properly

Blocks, sleepers or pavers under the four corner castings, every time. Never straight onto soil, never on three points, and check it with a level before the truck leaves — once it is off the bed, moving it 200mm is a job, not an adjustment.

On the river flats, get it higher than you think you need to. On sand at the coast, the risk is the opposite: the block settles unevenly over the first wet month and the doors stop meeting. A few pavers spreading the load under each casting fixes both problems for about forty dollars.

Where we deliver

Pick your town for local access detail rather than general advice.

Not on the list? We go further up and down the coast and further inland than most people assume, and the freight is often better than expected. Worth the call either way.

Tell us the job

We ring back the same day where we can. Your details stay with us.

No-obligation quote

Freight quoted with the container, always

The delivered price has the truck in it. No separate cartage bill turning up a week later.

Or skip the form entirely.

Call (02) 5616 9099
Call (02) 5616 9099Get a price